Anruisen (Suqian) Electronic Materials Co., Ltd
Annual production of 270000 tons of ultra-high purity wet electronic chemicals and electronic gases project
The first public announcement of environmental impact assessment
1、 Name and Overview of the Construction Project
Project Name: Annual Production of 270000 Tons of Ultra high Purity Wet Electronic Chemicals and Electronic Gases Project;
Construction unit: Anruisen (Suqian) Electronic Materials Co., Ltd;
Construction location: Ecological Chemical Technology Industrial Park, Suyu District, Suqian City;
Construction Overview: Proposed investment of 1 billion yuan: to build a new project with an annual output of 270000 tons of ultra-high purity wet electronic chemicals and electronic gases, and to clean and reuse its own waste packaging drums.
2、 Name and contact information of the construction unit
Construction unit: Anruisen (Suqian) Electronic Materials Co., Ltd
Contact: Mr. Chen
Contact phone number: 0512-58627988
Email: xiaochu.chen@aricen.cn
3、 Name and contact information of the environmental impact assessment agency responsible for the assessment work
Evaluation unit: Nanjing Yuanheng Environmental Research Institute Co., Ltd
Contact: Zhou Gong
Contact number: 025-87783362
Email: zhousuping@yuanhenghj.com;
4、 The working procedures and main contents of environmental impact assessment
The evaluation process: accepting construction project commission → signing project environmental impact assessment contract → on-site survey by the environmental impact assessment unit → providing project related information by the construction party → environmental status and quality investigation → environmental impact analysis research → preparing environmental impact assessment report → report evaluation and approval;
Main job responsibilities: Analyze the consistency between project site selection and relevant planning, and the consistency between project construction content and relevant policies. Based on engineering analysis, predict the environmental impacts of water, gas, sound, soil, etc., and propose pollution prevention and control measures. Based on the principles of environmental protection approval, a comprehensive analysis is conducted to determine the feasibility of the project construction on the proposed site, providing approval basis for project environmental management and technical support for project engineering design.
5、 Scope and precautions for soliciting public opinions
The scope of this public opinion solicitation is within the impact range of the construction project and the public who are concerned about the construction of this project.
6、 The network link of the public opinion form
The content and format of the public opinion form are formulated by the Ministry of Ecology and Environment. Please download it by yourself. Please refer to the attachment for details.
7、 The main ways for the public to express their opinions
The public can submit written opinions to the construction unit or environmental impact assessment unit through letters, faxes, emails, or other convenient means. The construction unit will truthfully record the opinions and suggestions of the public in the special instructions for public participation in the project, and reflect the valuable opinions and suggestions of the public to the construction unit and relevant departments of the project. (We do not accept issues unrelated to environmental protection).
[Note]: Please provide detailed contact information as much as possible when the public expresses their opinions.
8、 The starting and ending time for public opinions
You can provide feedback to the construction unit or environmental impact assessment unit from the date of public announcement.
Anruisen (Suqian) Electronic Materials Co., Ltd
October 13, 2022